Excellent Table Beer.
On three bushels of malt pour of hot water the third of the quantity you are to use, which is to be thirty nine gallons. Cover it warm half an hour, then mash, and let it stand two hours and a half more, then set it to drain. When dry, add half the remaining water, mash, and let it stand half an 238hour, run that into another tub, and pour the rest of the water on the malt, stir it well, and cover it, letting it infuse a full hour. Run that off, and mix all together. A pound and a quarter of hops should be infused in water, as in the former receipt, and be put into the tub for the first running.
Boil the hops with the wort an hour from the time it first boils. Strain off, and cool. If the whole be not cool enough that day to add to the yeast, a pail or two of wort may be prepared, and a quart of yeast put to it over night. Before tunning, all the wort should be added together, and thoroughly mixed with the lade pail. When the wort ceases to work, put a bit of paper on the bunghole for three days, when it may be safely fastened close. In three or four weeks the beer will be fit for drinking.
Note. Servants should be directed to put a cork into every barrel as soon as the cock is taken out, the air causing casks to become musty.